جلد 8، شماره 2 - ( 3-1391 )                   جلد 8 شماره 2 صفحات 154-163 | برگشت به فهرست نسخه ها


XML Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Zarif M, Javidi M H, Ghazizadeh S. Electricity Procurement for Large Consumers with Second Order Stochastic Dominance Constraints. IJEEE. 2012; 8 (2) :154-163
URL: http://ijeee.iust.ac.ir/article-1-442-fa.html
Electricity Procurement for Large Consumers with Second Order Stochastic Dominance Constraints. . 1391; 8 (2) :154-163

URL: http://ijeee.iust.ac.ir/article-1-442-fa.html


چکیده:   (2821 مشاهده)
This paper presents a decision making approach for mid-term scheduling of large industrial consumers based on the recently introduced class of Stochastic Dominance (SD)- constrained stochastic programming. In this study, the electricity price in the pool as well as the rate of availability (unavailability) of the generating unit (forced outage rate) is considered as uncertain parameters. The self-scheduling problem is formulated as a stochastic programming problem with SSD constraints by generating appropriate scenarios for pool price and self-generation unit's forced outage rate. Furthermore, while most approaches optimize the cost subject to an assumed demand profile, our method enforces the electricity consumption to follow an optimum profile for mid-term time scheduling, i.e. three months (12 weeks), so that the total production will remain constant.
متن کامل [DOC 994 kb]   (1233 دریافت)    
نوع مطالعه: Research Paper | موضوع مقاله: 1-Demand Side Management
دریافت: ۱۳۹۰/۷/۳۰ | پذیرش: ۱۳۹۲/۳/۴ | انتشار: ۱۳۹۲/۳/۴

ارسال نظر درباره این مقاله : نام کاربری یا پست الکترونیک شما:
کد امنیتی را در کادر بنویسید